MSP Parking Expansion LED Jobsite

 Minneapolis/ST. Paul AIrport's LED Jobsite

Minneapolis/ST. Paul AIrport's LED Jobsite

 

The MSP Parking Expansion, a project by PCL Construction Service, is an LED Jobsite where the temporary construction lights are state-of-the-art purpose built LED lights.  Compared to traditional bulb-based lighting, this joint-venture project has already:

The Metropolitan Airports Commission will be constructing a new 5,000-space parking structure at Terminal 1-Lindbergh at the Minneapolis-St. Paul International Airport.  The $229 million project is the largest in MSP history and will see an 11-story parking structure built to accommodate growth in airport operations and a continued increase in public parking demand. The project includes demolition of portions of existing infrastructure, construction of an eleven level parking structure, a rental car customer service building, a transit center, and construction of other supporting infrastructure.

In a continuing effort by PCL Construction Services to incorporate sustainable practices into all aspects of building, the MSP Parking Expansion project has adopted the LED Jobsite during the construction phase. The LED Jobsite replaces all traditional bulb-based temporary construction lighting with state-of-the-art purpose built LED lights. From the crane lights to the sidewalk lighting, the LED Jobsite will save energy, reduce CO2 emissions, and reduce waste.